Why does prep works ALWAYS take so long??  Today I taped off the INSIDES of all of the cabinets in the clutter room / laundry room.

I figured this was the best way to prepare them for spraying paint.

This protects all of the "guts" of the cabinets and only surfaces to be painted are exposed.

I'm not going to lie....I'm not excited about being in this little 8x10 room sealed up with plastic while I'm spraying paint and polyurethane.

While I was doing that Kade was working on the cased openings that go from the dining room/sitting room into the hallway.

He got a bunch of door trim cut and got both openings done.

Look at that beautiful job?  Now I need to fill those nail holes and then prime and paint.

Maybe I should wait and save the painting of the trim until the last thing I do before we move in??
Sounds like a pretty good idea right now  :)